An oil-water separator was needed to treat multiple dirty water pits. Baldwin designed a custom solution to meet the customer’s needs.

Multiple Feed Oil Water Separator Project

Challenge: Oil Water Separator required to cost effectively treat multiple dirty water pits. Solution: Oil water separators normally have a single or at most dual water inlet. For this situation there were six water sources that needed to be treated by the one oil water separator. Utilising their process expertise Baldwin were able to design and fabricate a…

Read more
Baldwin oil-water separators are commonly used for wastewater containing flammable hydrocarbons.

Hazardous Area Oil Water Separator Project

Challenge: To provide a hazardous area oil water separator to minimise time for site installation Solution: Baldwin Oil Water Separators are widely used in applications involving wastewater containing flammable hydrocarbons. The customer requirement for this project was an oil water separator with an ExD rated diaphragm feed pump, that would enable an efficient installation on site. The oil…

Read more

Coal Seam Gas Compressor Project

Coal Seam Gas (CSG) is a rapidly growing industry, that is critically important to Australia’s energy future. Extracting the gas from the coal fields is a proven technology, widely used and possessing known challenges. One such challenge is how to manage or treat the wastewater streams arising from CSG production. The compressors used in production…

Read more
Skim-Pak Floating Oil Skimmer Systems are designed to provide reliable, continuous performance in containment tanks.

Surface Oil Skimmer LNG Project

The offshore gas field is located 190 km from the Burrup Peninsula in Western Australia. The first phase of the Gas Development Project involved the construction of a Liquefied Natural Gas (LNG) Plant and its utilities, located on the Burrup Peninsula. The feed gas to the onshore gas plant is supplied by the Riser Offshore…

Read more
The BUSTA industrial wastewater treatment system is a cost-effective, manual stainless steel treatment unit featuring a mixer, timer, catch tray, and filter bag.

BUSTA Paint Manufacturer Project

An established paint manufacturer needed to improve the quality of their wash water prior to discharging to the sewer system. Contaminated wastewater is generated each time a vat or tank is washed out – usually when changing product blending.  This can generate between 100 litres to 500 litres per day. Tougher discharge limits to sewer,…

Read more
The RM-10 Treatment Plan is highly effective for the chemical treatment of wastewater, offering reliable performance and ensuring compliance with environmental standards.

Speciality Chemical Treatment RM-10 Project

One of Australia’s largest paint manufacturers, from their major production plant, produce over 50 million litres of premium quality paint annually and the regular washing down of equipment, vats and tanks produces around 50,000 litres of contaminated wastewater each day. Tougher discharge limits to sewer, increasing trade waste charges and high disposal costs (pump outs)…

Read more